All campus buildings are now operational

After a challenging summer restoring the university’s chilled water system, all buildings have reopened and returned to normal operations. The mobile chilling units across campus will remain in place into September, in case late summer brings high temperatures and humidity. All the buildings that were closed or partially closed were maintained throughout this time period and steps have been taken to facilitate their safe, efficient reopening. New questions and answers about building condition and safety are available on the FAQ page. Employees with additional questions should speak with their supervisor.

Read more